- 01 / 05
Raise
The requester fills the template your plant built. Sections owned by others wait for them.
- 02 / 05
Approve
The route resolves to real people the moment it is submitted. Each is told, on web or phone.
- 03 / 05
Isolate
Every lockout point is applied, then verified by someone else. Until then, the permit cannot start.
- 04 / 05
Activate
The clock starts on activation, on plant time. Extensions go to the role your plant chose.
- 05 / 05
Close
The area is handed back, and the full record is one PDF away.
EHS · Permit to work · Site access
One connected platform for plant safety, permits and site access.
SafetySetu digitises your permit-to-work process and the gate, and gives you live visibility of every job on the floor.
DashboardDahej Unit 1
LiveActive right now12
Awaiting approval3
Open lockouts4
Closed this week38
Permit / workNext actionValidityStatus
DU1/2026/10/HW/000456Hot Work · Maintenance · Reactor Bay R-3Work in progressin 3hActive
DU1/2026/10/CS/000455Confined Space · Production · Vessel V-204Your approval neededin 10hUnder Review
DU1/2026/10/LB/000453Line Breaking · Maintenance · Pipe Rack PR-6Ready to activateNot startedApproved
DU1/2026/10/EL/000425Electrical · Utilities · Substation 1Work in progressin 11hActive
Gate passValid today
Ganesh PawarFabtech EngineeringFABTECH/DU1/CW/000187
Dahej Unit 107:00 to 19:00
ChemicalPharmaceuticalAgrochemicalSpecialty chemicalsGas & energyFabricationEngineeringManufacturing

01 One platform
Two products. Stronger together.
Each works alone. Together they share one sign-in, and SafetySetu Access to manage people, roles and sites for both.
02 Live visibility
Follow one permit through the plant.
DU1/2026/10/HW/000456Hot work · Reactor Bay R-3
ClosedJob details
Raised by Kiran MenonMaintenance · Welding on feed line flange
Approvals
Area ownerProduction · S. Iyer
Safety officerEHS · R. Patel
Department headMaintenance · V. Desai
Isolation
Verified · MCC-4Verified · V-112Verified · V-118
Validity
09:00Closed 16:4018:00
Closed · area handed back
03 Three ways to work
Web, mobile and kiosk.
Set it up on the web, approve on the phone, check people in at the gate.
FieldsTextChecklistGas test readingPerson pickerSignaturePhoto
Job detailsFilled by Requester
Work descriptionEquipmentCrew size
Gas testFilled by Safety officer
LEL %O₂ %
IsolationFilled by Maintenance
Lockout points
Draft · version 4Publish
Approval neededDU1/2026/10/CS/000455
Confined SpaceVessel V-204Raised by Arjun Rao
- Area ownerS. Iyer
- Safety officerYou
- Department headV. Desai
Also in your queue
ElectricalSubstation 1
Work at HeightPipe Bridge
RejectApprove
Main gate · Dahej Unit 1On site 148
Scanning pass
Hold the pass to the camera
- VS-000232Admitted
- A. ThakurRefused · Induction lapsed
- M. YadavAdmitted
04 Rules, not promises
Why plants choose SafetySetuThe numbers are the product.
3Extension windows: 8, 12 or 24 hours. Nothing in between.
2People on every lockout: one applies it, another verifies it.
25Workers on one group pass, each checked at the gate.
0Requests anyone can approve for themselves.
05 Where we are going · coming next
Our story
Why we built itSafetySetu began with conversations inside Gujarat's chemical plants, and is built to a world-class standard for plants anywhere.